Dredger fill engineering
2015年度高等级龙都崖门出海龙都维护疏浚余泥二次转吹龙都
2015 annual high-grade waterway Yamen seaway maintenance dredging secondary mud transfer project
本龙都为崖门出海龙都1#标至21#标间约25公里的出浅航段进行维护疏浚。
维护标准为水深6.5米,航宽90米,边坡1:5,吹填疏浚龙都量约为125万立方米。
龙都介绍Reef blasting works
本项目疏浚吹填龙都主要是将疏浚余泥全部吹到指定卸泥区,卸泥区位于疏浚河段的北段西岸陆域(崖门出海龙都西岸的银湖湾围垦新洲围吹填区)。
疏浚土通过耙吸船抛卸于临时储泥池,再通过绞吸船吹至卸区。龙都一侧进行疏浚吹填作业,施工期间船舶不断航。
 
The project of dredging and blow-fill mainly blows all the dredged residual mud into the designated dumping area. The dumping area is located in the western bank of the northern section of the dredging section (Yinhu Bay Reclamation in the West Bank of the Yamen Sea Channel).

Dredging soil through the rake suction ship thrown into the temporary storage tank, and then through the suction dredger blowing to the unloading area. One side of waterway dredging and filling operation, the ship continued to sail during construction.